# Inside Inner Mongolia, China's fastest-growing AI data center region, where construction is accelerating with low building cost and no public backlash (SemiAnalysis) — retained record

> Retained techmeme record from techmeme.

Canonical: https://highsignal.app/data/records/444d0aefb747e929

[← sources](https://highsignal.app/data)


source: [techmeme](https://highsignal.app/data/techmeme) published 2026-11-08 11:00 ingested 2026-11-09 02:39

[original source ↗](https://newsletter.semianalysis.com/p/we-visited-chinas-stargate-in-inner)

## retained text



```
Techmeme permalink: https://www.techmeme.com/261108/p7#a261108p7

<a href="https://newsletter.semianalysis.com/p/we-visited-chinas-stargate-in-inner"><img align="RIGHT" border="0" hspace="4" src="http://www.techmeme.com/261108/i7.jpg" vspace="4" /></a>
<p><a href="https://www.techmeme.com/261108/p7#a261108p7" title="Techmeme permalink"><img height="12" src="http://www.techmeme.com/img/pml.png" style="border: none; padding: 0; margin: 0;" width="11" /></a> <a href="https://newsletter.semianalysis.com/">SemiAnalysis</a>:<br />
<span style="font-size: 1.3em;"><b><a href="https://newsletter.semianalysis.com/p/we-visited-chinas-stargate-in-inner">Inside Inner Mongolia, China's fastest-growing AI data center region, where construction is accelerating with low building cost and no public backlash</a></b></span>&nbsp; &mdash;&nbsp; A wind-powered 800MW campus, 120MW built within a year, a 5MW SST-native 800V DC pilot and a cooling design without central chillers</p>
```



document fetched 2026-11-09 02:32 · canonical https://techmeme.com/261108/p7
