# sane spare. 3 plants. 3 completely different failure risks. why would the reorder point be the same? — retained record

> Retained reddit record from reddit:supplychain.

Canonical: https://highsignal.app/data/records/decbbdec55ec7a7f

[← sources](https://highsignal.app/data)


source: [reddit](https://highsignal.app/data/reddit) (reddit:supplychain)  published 2026-09-25 11:42 ingested 2026-09-26 02:38

[original source ↗](https://www.reddit.com/r/supplychain/comments/1wpu45i/sane_spare_3_plants_3_completely_different/)

## retained text



```
hypothetical but say the exact same spare sits across 3 plants:  
  
Plant A: 8 installed, no redundancy, 7 month lead time  
Plant B: 2 installed, redundant equipment  
Plant C: 1 installed, line gets retired next year  


all 3 barely consume the part.

yet ERP has basically the same min/max logic everywhere.

this is why the dynamic ROP side of Verdantis MRO360 makes more sense to me than just yelling "AI forecast". same SKU doesn't mean same risk. criticality, actual demand, supplier reliability, lead time and what the rest of the network has should change the stocking decision

for slow/intermittent MRO, are you guys actually setting ROP by plant risk or mostly letting historical usage drive it?
```



document fetched 2026-09-26 00:38 · canonical https://reddit.com/r/supplychain/comments/1wpu45i/sane_spare_3_plants_3_completely_different
