Mesa AZ — City Council: Three-Year Term Contract with Two-Year Renewal Options for Electric Substation Infrastructure Work for the Energy Resources Department (Sole Source) (Citywide) This contract is for specialized substation engineering, construction support, and technical services for the exp
retained text
File: 26-0631 Type: Contract Status: Agenda Ready Body: City Council Introduced: 2026-06-30 Agenda date: 2026-07-20 Three-Year Term Contract with Two-Year Renewal Options for Electric Substation Infrastructure Work for the Energy Resources Department (Sole Source) (Citywide) This contract is for specialized substation engineering, construction support, and technical services for the expansion, modification, and integration of electric substation infrastructure. Work includes coordination with existing substation design standards, protection and control schemes, equipment layout, and system integration to ensure compatibility with the City's current substation fleet and operational practices. The Energy Resources Department and Procurement Services recommend awarding the contract to the sole source vendor, Reinhausen Manufacturing Inc., in an amount not to exceed $1,000,000, with an annual increase allowance of up to 5% or the adjusted Consumer Price Index.
document fetched 2026-07-29 08:25