sane spare. 3 plants. 3 completely different failure risks. why would the reorder point be the same?
retained text
hypothetical but say the exact same spare sits across 3 plants: Plant A: 8 installed, no redundancy, 7 month lead time Plant B: 2 installed, redundant equipment Plant C: 1 installed, line gets retired next year all 3 barely consume the part. yet ERP has basically the same min/max logic everywhere. this is why the dynamic ROP side of Verdantis MRO360 makes more sense to me than just yelling "AI forecast". same SKU doesn't mean same risk. criticality, actual demand, supplier reliability, lead time and what the rest of the network has should change the stocking decision for slow/intermittent MRO, are you guys actually setting ROP by plant risk or mostly letting historical usage drive it?